Battery Storage System is installed on the original waste dump from a nearby farm, concurrently in an area with a high groundwater level. This posed a challenge in terms of preparing foundations and a suitable subgrade for installation. The implementation involved a combination of smaller concrete foundations and a metallic support platform. The entire system is powered through newly installed substations (10.5kV) integrated into the local grid.
21 MW
52.9 MWh
Li- ion LFP