Enstra group
Lučenec, Slovakia
2021
System was dimensioning to cooperate with local CHP units installation to provide optimization of capacity contracted from DSO & providing flexibility (with faster response time compared to CHP units).
Peak shaving, flexibility, back-up power
688 kWh (Li-ion LFP)
344 kW
6 x 2.44 x 3.09 (L x D x H)
11 tons
SoH 70% @ 8000cycles
Total RTE 89.5%
Reaction time < 500ms
Providing EPC delivery with civil works and new transfomer station (750kVA) with connection to local SCADA control system.
3 years
8 years for degradation